Nearly two thirds of Anthropic's planned US data center capacity is tied to new gas plants

The Better Data Center Project traced 9.6 GW of US data center capacity Anthropic has contracted or is in talks for. Gas plants built for the new load would serve 65% of it, and if it all runs in 2028 it would emit 31.5 Mt of CO2e a year, about as much as California's power plants. We rebuilt the numbers from the project's data: they hold, but the total depends mostly on how much capacity gets built.

Power source the project assigns to Anthropic's planned US capacity

Share of 9.6 GW of IT capacity contracted or in talks at 19 sites. For sites on the existing grid, the coal and gas shares are the plants EPA's AVERT model expects to run more to meet new load, not a supply contract.

  • Existing grid coal: 1.0 GW, 11%
  • Existing grid gas: 2.1 GW, 22%
  • Nuclear: 0.2 GW, 2%
  • New grid gas: 3.7 GW, 39%
  • On-site gas: 2.5 GW, 26%

Nuclear: 169 MW, 2%.

Anthropic's planned US data centers and the gas plants tied to them

Squares are sites, sized by Anthropic's capacity. Circles are gas plants tied to them, sized by gas capacity.

Monarch Compute Campus Power Plant: 8,160 MW gas (RICE), announced, expected 2031Nexus Hubbard: 7,230 MW gas (CCGT (6,331 MW), SCGT (409 MW), RICE (490 MW)), pre-construction, expected 2027Schahfer Generating Station: 2,300 MW gas (CCGT), pre-construction, expected 2031Meta Hyperion - Pointe Coupee: 2,262 MW gas (CCGT), pre-construction, expected 2031Colossus 2 power station: 1,736 MW gas (SCGT), pre-construction, expected 2025Traceview Advanced Power Station: 754 MW gas (CCGT), permitted, expected 2029Vicksburg Advanced Power Station: 754 MW gas (CCGT), construction, expected 2028Delta Blues Advanced Power Station: 754 MW gas (CCGT), construction, expected 2028Colossus 1 power station: 247 MW gas (SCGT (247 MW), Solar (25 MW)), operating, expected 2024New Carlisle campus (St. Joseph, IN), AWS: 1037-1960 MW, Grid, new gasMonarch Compute Campus (Mason, WV), Nscale: 460-920 MW, On-site gasRidgeland campus (Madison, MS), AWS: 228-840 MW, Grid, new gasCanton campus (Madison, MS), AWS: 284-683 MW, Grid, new gasColossus 2 (Shelby, TN), SpaceX / xAI: 200-600 MW, On-site gasProject Flex (Oakland, MI), Verrus / Walbridge: 200-525 MW, Grid, existing gas and coal, county locationNexus Hubbard (Hill, TX), Nexus Data Centers: 500 MW, On-site gasCedar Creek campus (Bastrop, TX), BlackChamber Partners / Pacifico Energy (power): 100-490 MW, On-site gas, county locationMeridian Arc (Sullivan, IN), Meridian Compute / Fluidstack / Next Frontier: 430 MW, Grid, existing gas and coal, county locationJustified Data campus (Hancock, KY), TeraWulf: 401 MW, Grid, existing gas and coalLake Mariner (Niagara, NY), TeraWulf / Fluidstack: 378 MW, Grid, existing gas and coalBeacon Point (Nueces, TX), Hut 8 developer; NVIDIA/Lambda service chain: 350-352 MW, Grid, existing gas and coal, county locationColossus 1 (Shelby, TN), SpaceX / xAI: 300-340 MW, Grid, existing gas and coalRiver Bend (West Feliciana Parish, LA), Hut 8 / Fluidstack: 245 MW, Grid, new gas, county locationBarber Lake (Mitchell, TX), Cipher Digital / Fluidstack: 207 MW, Grid, existing gas and coalRockdale campus (Milam, TX), Riot Platforms: 191 MW, Grid, existing gas and coal, county locationMaysville campus (Jackson, GA), RUM Group / Northern Data: 120-180 MW, Grid, existing gas and coal, county locationSusquehanna campus (Luzerne, PA), AWS: 108-169 MW, Nuclear contractAbernathy HPC campus (Hale, TX), Fluidstack investor group; formerly TeraWulf JV: 168 MW, Grid, existing gas and coal, county locationNew Carlisle campusMonarch Compute CampusRidgeland campusCanton campusColossus 2Project FlexNexus HubbardCedar Creek campus

CO2 a year from Anthropic's planned US sites, compared

Million metric tons of CO2e, if all sites run in 2028; the cases are explained in the last chart. Companies: location-based Scope 2.

Anthropic's sites in 2028, projected

  1. High case37.8 Mt
  2. Mid case31.5 Mt
  3. Low case16.7 Mt

Reported

  1. California's power plants, 202431.1 Mt
  2. Google, 202515.1 Mt
  3. Microsoft, FY202512.0 Mt
  4. Meta, 20257.8 Mt

CO2 per kWh of the power serving each site

Grams of CO2e per kWh. Abernathy HPC campus in TX is highest at 733 g/kWh. The 19 sites average 469 g/kWh, weighted by capacity. Grid sites use marginal rates, which run higher than a grid's average.

  1. Abernathy HPC campus (TX)733 g/kWh
  2. Justified Data campus (KY)717 g/kWh
  3. Meridian Arc (IN)717 g/kWh
  4. Project Flex (MI)717 g/kWh
  5. Maysville campus (GA)610 g/kWh
  6. Monarch Compute Campus (WV)604 g/kWh
  7. Colossus 1 (TN)576 g/kWh
  8. Colossus 2 (TN)565 g/kWh
  9. Beacon Point (TX)560 g/kWh
  10. Barber Lake (TX)560 g/kWh
  11. Rockdale campus (TX)560 g/kWh
  12. Cedar Creek campus (TX)447 g/kWh
  13. Lake Mariner (NY)445 g/kWh
  14. Canton campus (MS)340 g/kWh
  15. Ridgeland campus (MS)340 g/kWh
  16. River Bend (LA)340 g/kWh
  17. Nexus Hubbard (TX)326 g/kWh
  18. New Carlisle campus (IN)319 g/kWh
  19. Susquehanna campus (PA)0 g/kWh

Nitrogen oxides per kWh of the power serving each site

Grams of NOx per kWh. Abernathy HPC campus is highest. Colossus 2 runs on temporary turbines mostly without catalytic controls.

  1. Abernathy HPC campus (TX)0.52 g/kWh
  2. Justified Data campus (KY)0.40 g/kWh
  3. Meridian Arc (IN)0.40 g/kWh
  4. Project Flex (MI)0.40 g/kWh
  5. Colossus 2 (TN)0.39 g/kWh
  6. Beacon Point (TX)0.29 g/kWh
  7. Barber Lake (TX)0.29 g/kWh
  8. Rockdale campus (TX)0.29 g/kWh
  9. Maysville campus (GA)0.28 g/kWh
  10. Colossus 1 (TN)0.20 g/kWh
  11. Lake Mariner (NY)0.14 g/kWh
  12. Monarch Compute Campus (WV)0.08 g/kWh
  13. New Carlisle campus (IN)0.08 g/kWh
  14. Cedar Creek campus (TX)0.04 g/kWh
  15. Canton campus (MS)0.03 g/kWh
  16. Ridgeland campus (MS)0.03 g/kWh
  17. River Bend (LA)0.03 g/kWh
  18. Nexus Hubbard (TX)0.02 g/kWh
  19. Susquehanna campus (PA)0.00 g/kWh

What the 2028 estimate depends on

Million metric tons of CO2e a year. Grid-average rates lower the mid case by 9%; how much capacity runs, and how hard, moves it most.

  1. Mid case: 9.6 GW, PUE 1.145, 70% use31.5 Mt
  2. Grid-average instead of marginal rates28.8 Mt
  3. Without the 3 speculative AWS campuses27.9 Mt
  4. Both24.1 Mt
  5. Sites with late gas plants on today's grid31.7 Mt
  6. High case: 9.6 GW, PUE 1.2, 80% use37.8 Mt
  7. Low case: 5.9 GW, PUE 1.1, 60% use16.7 Mt

About the data