Nearly two thirds of Anthropic's planned US data center capacity is tied to new gas plants
The Better Data Center Project traced 9.6 GW of US data center capacity Anthropic has contracted or is in talks for. Gas plants built for the new load would serve 65% of it, and if it all runs in 2028 it would emit 31.5 Mt of CO2e a year, about as much as California's power plants. We rebuilt the numbers from the project's data: they hold, but the total depends mostly on how much capacity gets built.
Power source the project assigns to Anthropic's planned US capacity
Share of 9.6 GW of IT capacity contracted or in talks at 19 sites. For sites on the existing grid, the coal and gas shares are the plants EPA's AVERT model expects to run more to meet new load, not a supply contract.
Existing grid
New grid plants
On-site
Coal1.0 GW, 11%
Gas2.1 GW, 22%
New grid gas3.7 GW, 39%
On-site gas2.5 GW, 26%
Existing grid coal: 1.0 GW, 11%
Existing grid gas: 2.1 GW, 22%
Nuclear: 0.2 GW, 2%
New grid gas: 3.7 GW, 39%
On-site gas: 2.5 GW, 26%
Nuclear: 169 MW, 2%.
Anthropic's planned US data centers and the gas plants tied to them
Squares are sites, sized by Anthropic's capacity. Circles are gas plants tied to them, sized by gas capacity.
On-site gasGrid, new gasGrid, existing gas and coalNuclear contractGas plantLocated at county level
CO2 a year from Anthropic's planned US sites, compared
Million metric tons of CO2e, if all sites run in 2028; the cases are explained in the last chart. Companies: location-based Scope 2.
Anthropic's sites in 2028, projected
High case37.8 Mt
Mid case31.5 Mt
Low case16.7 Mt
Reported
California's power plants, 202431.1 Mt
Google, 202515.1 Mt
Microsoft, FY202512.0 Mt
Meta, 20257.8 Mt
CO2 per kWh of the power serving each site
Grams of CO2e per kWh. Abernathy HPC campus in TX is highest at 733 g/kWh. The 19 sites average 469 g/kWh, weighted by capacity. Grid sites use marginal rates, which run higher than a grid's average.
On-site gasGrid, new gasGrid, existing gas and coalNuclear contract
Abernathy HPC campus (TX)733 g/kWh
Justified Data campus (KY)717 g/kWh
Meridian Arc (IN)717 g/kWh
Project Flex (MI)717 g/kWh
Maysville campus (GA)610 g/kWh
Monarch Compute Campus (WV)604 g/kWh
Colossus 1 (TN)576 g/kWh
Colossus 2 (TN)565 g/kWh
Beacon Point (TX)560 g/kWh
Barber Lake (TX)560 g/kWh
Rockdale campus (TX)560 g/kWh
Cedar Creek campus (TX)447 g/kWh
Lake Mariner (NY)445 g/kWh
Canton campus (MS)340 g/kWh
Ridgeland campus (MS)340 g/kWh
River Bend (LA)340 g/kWh
Nexus Hubbard (TX)326 g/kWh
New Carlisle campus (IN)319 g/kWh
Susquehanna campus (PA)0 g/kWh
Nitrogen oxides per kWh of the power serving each site
Grams of NOx per kWh. Abernathy HPC campus is highest. Colossus 2 runs on temporary turbines mostly without catalytic controls.
On-site gasGrid, new gasGrid, existing gas and coalNuclear contract
Abernathy HPC campus (TX)0.52 g/kWh
Justified Data campus (KY)0.40 g/kWh
Meridian Arc (IN)0.40 g/kWh
Project Flex (MI)0.40 g/kWh
Colossus 2 (TN)0.39 g/kWh
Beacon Point (TX)0.29 g/kWh
Barber Lake (TX)0.29 g/kWh
Rockdale campus (TX)0.29 g/kWh
Maysville campus (GA)0.28 g/kWh
Colossus 1 (TN)0.20 g/kWh
Lake Mariner (NY)0.14 g/kWh
Monarch Compute Campus (WV)0.08 g/kWh
New Carlisle campus (IN)0.08 g/kWh
Cedar Creek campus (TX)0.04 g/kWh
Canton campus (MS)0.03 g/kWh
Ridgeland campus (MS)0.03 g/kWh
River Bend (LA)0.03 g/kWh
Nexus Hubbard (TX)0.02 g/kWh
Susquehanna campus (PA)0.00 g/kWh
What the 2028 estimate depends on
Million metric tons of CO2e a year. Grid-average rates lower the mid case by 9%; how much capacity runs, and how hard, moves it most.
Mid case: 9.6 GW, PUE 1.145, 70% use31.5 Mt
Grid-average instead of marginal rates28.8 Mt
Without the 3 speculative AWS campuses27.9 Mt
Both24.1 Mt
Sites with late gas plants on today's grid31.7 Mt
High case: 9.6 GW, PUE 1.2, 80% use37.8 Mt
Low case: 5.9 GW, PUE 1.1, 60% use16.7 Mt
About the data
Source: the Better Data Center Project's case study, dataset and map (November 2026). 9.6 GW is 5.9 GW contracted plus capacity in talks, of about 15 GW Anthropic has contracted worldwide. Amazon, SpaceX and developers run the sites.
Method: IT capacity × PUE × use × 8,760 hours. Grid sites use EPA AVERT marginal rates, on-site and new gas plants their permit rates. Susquehanna buys nuclear power, so counts as zero.
Our checks: the recomputed totals match. Grid-average rates are EPA eGRID 2023 by balancing authority. Epoch AI tags the Canton, Ridgeland and Susquehanna campuses (1.7 GW) as speculative. The gas plants for New Carlisle campus, Monarch Compute Campus and River Bend open after 2028.
Comparisons: EIA (California, excluding imports) and the Google, Microsoft and Meta reports, location-based Scope 2. Some of Anthropic's load also counts in those companies' figures.