Data centers need power, but rural residents pay the price. The share with high energy bills rose 76% more than in cities
A Cornell study estimates that data centers raised the share of rural households spending over 6% of their income on energy 76% more than in cities. On four US grids, data centers drove 24% of the $34.0B of new transmission projects approved in 2025 and are charged 9%. Homes drove 10% and are charged 47%.
Rural counties see the biggest rise in households spending over 6% of income on energy
How many more households in every 100 now spend over 6% of their income on energy.
- Rural counties+2.9 per 100 households
- Suburban counties+2.4 per 100 households
- Urban counties+1.6 per 100 households
The poorest households see the biggest rise in energy costs as a share of income
How many more cents of every dollar earned go on energy, by household income against the local median.
- Under 30% of local median+1.6¢ per $1
- 30 to 60%+0.8¢ per $1
- 60 to 80%+0.6¢ per $1
- 80 to 100%+0.6¢ per $1
- 100 to 150%+0.5¢ per $1
- Over 150%+0.4¢ per $1
How much power data centers on the four grids can draw
Data center capacity at the end of 2025, 41.7 GW in all. Dominion's area of Virginia alone has 11.6 GW. The study estimates data centers raised wholesale power prices there by about 0.7¢/kWh (15%), and in the southern Bay Area by about 1.2¢/kWh (20%).
- PJM22.1 GW
- ERCOT (Texas)11.0 GW
- MISO (Midwest)4.8 GW
- CAISO (California)3.9 GW
Where new grid costs come from, and whose bills they land on
Share of the cost of transmission projects approved in 2025 for new demand.
Data centersHomesOther new demand
All four grids $34.0B
- Cost from their demand24%10%66%
- Cost on their bills9%47%43%
PJM (Mid-Atlantic, Ohio, Chicago) $5.95B
- Cost from their demand55%44%
- Cost on their bills20%54%26%
ERCOT (Texas) $17.9B
- Cost from their demand17%11%72%
- Cost on their bills8%47%45%
MISO (Midwest) $7.41B
- Cost from their demand20%13%67%
- Cost on their bills44%52%
CAISO (California) $2.76B
- Cost from their demand18%17%65%
- Cost on their bills6%46%48%
What PJM utilities are charged for new grid projects, and where the projects are
Each utility's charge for PJM's 2025 projects, by where the projects are. Pepco, which serves DC, is charged $189M, all for projects elsewhere.
Projects in its own areaProjects in Dominion's areaProjects in other areas
Charged
- Dominion (Virginia)67%33%$2.38B
- PPL (PA)87%8%$646M
- AEP (OH, WV, VA, IN and others)52%20%28%$485M
- ComEd (Chicago)53%18%29%$453M
- Allegheny Power (PA, WV, MD)81%16%$428M
- FirstEnergy Ohio64%14%22%$364M
- BGE (Baltimore)27%21%53%$220M
- Pepco (DC, MD)35%65%$189M
- PSE&G (NJ)18%32%50%$129M
- Duke Energy Ohio and Kentucky52%19%29%$112M
- Delmarva (DE, MD)41%17%42%$100M
- Met-Ed (PA)67%13%20%$95M
- PECO (Philadelphia)38%60%$88M
- Jersey Central (NJ)38%59%$67M
- AES Ohio (Dayton)42%23%36%$60M
- East Kentucky Power39%61%$39M
- Penelec (PA)16%32%51%$36M
- Atlantic City Electric (NJ)39%61%$28M
- Duquesne (Pittsburgh)39%61%$28M
- Rockland Electric (NJ)40%60%$4M
- Source: Feng and You (Cornell), Nature Energy, November 2026, from the study's source data. All figures are study estimates.
- Costs are capital costs of transmission projects PJM, ERCOT, MISO and CAISO approved in 2025 for new demand, paid through power bills over decades. A data center's own grid connection costs aren't included.
- The household figures are the study's percentage-point rises, shown per 100 households and in cents per dollar. They carry price and cost-sharing estimates through to energy spending, so they rest on more assumptions. Counties show the typical county in each group, income bands the median. Cornell's "up to 28% of income" is the single highest record.
- Capacity is what data centers can draw, not what they use. The cost model assumes they use 80% of it. The price effects are on wholesale prices; how much reaches retail bills, and when, varies by state.
- Data centers are charged 38% of the cost they drove, Cornell's headline figure. Homes are charged 4.6 times theirs.