4 datacenter sites are tracked in Washington, D.C., deduplicated from 4 building permits and public facility records: 4 operational and 0 under construction across 1 cities.
Download Washington, D.C. data as CSV · free, no signup, 4 rows.
CoreSite · Zayo Group · AiNET.
| Operator / site | City | Status | Construction value | Latest permit |
|---|---|---|---|---|
| CoreSite | Washington | Operational | ||
| Zayo Group | Washington | Operational | ||
| AiNET | Washington | Operational | ||
| CoreSite | Washington | Operational |
We track 4 datacenter sites in Washington, D.C., deduplicated from 4 building permits and public facility records. Of those, 4 are operational and 0 are under construction. Facility directories report different totals because they count colocation suites and carrier hotels differently, so treat this as what we can evidence from public records rather than a definitive census.
0 sites in Washington, D.C. have permits indicating construction is under way. Because this comes from building permits rather than press releases, it reflects work that has actually been filed with a local authority.
3 named operators appear in Washington, D.C., including CoreSite, Zayo Group, AiNET. 64% of sites nationally name an operator; the rest are permits filed by an LLC or contractor we could not resolve to a parent company.
Virginia · Texas · California · Illinois · Ohio · Georgia · Oregon · New York · Colorado · Arizona · New Jersey · Pennsylvania · Florida · Massachusetts · Iowa · Minnesota · North Carolina · Washington · Missouri · Tennessee · Maryland · Utah · Nevada · Indiana · Nebraska · Michigan · Oklahoma · Wisconsin · South Carolina · Wyoming
Open the interactive construction map · US construction report · All operators
Source: Kadoa open data, built from local building permits, public facility records and state utility filings. Free and open. Counts describe what we track, which is not necessarily every facility in existence.