Cerro Lindo: production by quarter
Cerro Lindo is operated by Nexa Resources in Peru and produces Copper, Gold, Lead, Silver, Zinc.
| Quarter | Silver (koz) | Zinc (kt) | Copper (kt) | Lead (kt) | Gold (koz) |
|---|---|---|---|---|---|
| Q2 2026 | 923.0 | 21.9 | 4.9 | 2.7 | 0.600 |
| Q4 2025 | 900.0 | 16.9 | 6.4 | 2.1 | 1.1 |
| Q3 2025 | 1,100 | 24.6 | 6.7 | 2.8 | 1.0 |
| Q2 2025 | 1,100 | 22.3 | 6.8 | 2.9 | 1.0 |
| Q1 2025 | 900.0 | 23.3 | 7.2 | 2.5 | 1.0 |
| Q4 2024 | 1,300 | 24.3 | 5.9 | 4.9 | 1.2 |
| Q3 2024 | 900.0 | 14.7 | 8.1 | 2.0 | 1.4 |
| Q2 2024 | 1,100 | 23.1 | 7.5 | 3.7 | 1.3 |