29 EdgeConneX datacenter sites across 20 states. 2 under construction, with $2K of construction value on the permits that disclose one.
Arizona · Tennessee · Ohio · Colorado · Texas · Nevada · Oregon · Florida · Pennsylvania · California · Michigan · Georgia · Massachusetts · Virginia · Utah · Washington · Wisconsin · Minnesota · Louisiana · Illinois
| Operator / site | Location | Status | Construction value | Latest permit |
|---|---|---|---|---|
| EdgeConneX | Mesa, AZ | Under construction | $2K | 2025-12-03 |
| EdgeConneX | Nashville, TN | Operational | ||
| EdgeConneX | New Albany, OH | Under construction | ||
| EdgeConneX | Englewood, CO | Operational | ||
| EdgeConneX | Katy, TX | Operational | ||
| EdgeConneX | Tempe, AZ | Operational | ||
| EdgeConneX | Las Vegas, NV | Operational | ||
| EdgeConneX | Hillsboro, OR | Operational | ||
| EdgeConneX | Miami, FL | Operational | ||
| EdgeConneX | Pittsburgh, PA | Operational | ||
| EdgeConneX | Rancho Cordova, CA | Operational | ||
| EdgeConneX | Southfield, MI | Operational | ||
| EdgeConneX | San Diego, CA | Operational | ||
| EdgeConneX | Atlanta, GA | Operational | ||
| EdgeConneX | Memphis, TN | Operational | ||
| EdgeConneX | Billerica, MA | Operational | ||
| EdgeConneX | Tallahassee, FL | Operational | ||
| EdgeConneX | Richmond, VA | Operational | ||
| EdgeConneX | Jacksonville, FL | Operational | ||
| EdgeConneX | Salt Lake City, UT | Operational | ||
| EdgeConneX | Tukwila, WA | Operational | ||
| EdgeConneX | Santa Clara, CA | Operational | ||
| EdgeConneX | Madison, WI | Operational | ||
| EdgeConneX | Eden Prairie, MN | Operational | ||
| EdgeConneX | Miami, FL | Operational | ||
| EdgeConneX | Hillsboro, OR | Operational | ||
| EdgeConneX | Atlanta, GA | Operational | ||
| EdgeConneX | Slidell, LA | Operational | ||
| EdgeConneX | Elk Grove Village, IL | Operational |
We track 29 EdgeConneX datacenter sites across 20 states, identified through building permits, public facility records and official operator listings. This is a count of locations we can tie to EdgeConneX, rather than a complete corporate footprint. Leased colocation space and sites permitted through unnamed LLCs may not be attributed here.
2 of the EdgeConneX sites we track have permits indicating construction is under way, in Arizona, Ohio.
Cogent · Digital Realty · Amazon / AWS · Equinix · DataBank · Flexential · Lumen · CoreSite · QTS Realty · CyrusOne · Microsoft · Centersquare · TierPoint · H5 Data Centers · 365 Data Centers · VPLS · Vantage Data Centers · Crown Castle Inc. · ark data centers · Aligned Data Centers · T5 Data Centers · DartPoints, LLC · Expedient · Ziply Fiber · Netrality Data Centers · Iron Mountain Data Centers · Advanced Communications Technology · Stream Data Centers · Colocation America Corporation · Cologix
Open the interactive construction map · US construction report · All operators
Source: Kadoa open data, built from local building permits, public facility records and official operator listings, with separate state utility filings. Free and open. Counts describe what we track, which is not necessarily every facility in existence.